Abbreviations and terminology
The following abbreviations are used throughout this book:
- ANZSMM: Australian and New Zealand Standard Method of Measurement
- ASMM: Australian Standard Method of Measurement
- BQ: Bill of Quantities
- CAD: Computer-aided Design
- CHS: Circular Hollow Section
- f’c: Specified compressive strength of concrete at 28 days
- MPa: Megapascal
- PDF: Portable Document Format
- PF: Pad Footing
- QS : Quantity Surveying
- RF: Raft Footing
- RHS: Rectangular Hollow Section
- SF: Strip Footing
- SHS: Square Hollow Section
- UOM: Unit of Measurement
The terms “RIB CostX” and “CostX” are used interchangeably throughout the handbook.